Please quote to supply and install an outside drinking fountain.
1. To excavate a trench from the art block to position of drinking fountain.
2. To form a concrete base to stand new drinking fountain, supply and install 25mm MDPE water pipe from Art block to drinking fountain, complete with connection to cold water main with isolation valve.
3. Reinstate excavated trench.
Work to be carried out during the School Summer Holidays.